2.2.1. Lab – Install a F5 Networks BIG-IP Appliance

Todo

Needs lab description

In this lab we will unpack and install the BIG-IP Appliance into a rack in your datacenter.

2.2.1.1. Task – Unpack the BIG-IP Appliance

Todo

Needs task description

In this task you will remove the BIG-IP Appliance from it’s packaging.

Follow these steps to complete this task:

  1. Open the box with an extremely sharp knife or cutter

    Danger

    Knives are sharp and can cut you. Please be careful.

    knivessharp

  2. Carefully remove the BIG-IP from it’s packaging

  3. Set it down on a stable surface

2.2.1.2. Task – Install the BIG-IP Appliance in a Datacenter Rack

Todo

Needs task description

In this task you will install the BIG-IP Appliance into a Rack. You will need the following tools:

  • Phillips Screwdriver
  • Hammer
  • Crowbar

Caution

Appliances can be heavy. Please follow all applicable safety guidelines.

Follow these steps to complete this task:

  1. Install the rackmount rails onto the appliance using the included hardware
  2. Lift the appliance into place
  3. Complete installation by using your tools to secure the appliance.